Search
Noname
| Authors: Molev Yu.I. | Published: 29.08.2014 |
| Published in issue: #4(571)/2006 | |
| Category: Transportation and Power Engineering | |
| Keywords: |
The problem of power inputs calculation at changing of time of snow-clearing is analyzed. Rational quantities of drift-snow transport speed, traffic level and the start of clearing are surveyed.