Workflow Planning System for a Machine Building Enterprise With Assembly Line Manufacturing
Authors: Ermolova M.A. | Published: 06.08.2015 |
Published in issue: #8(665)/2015 | |
Category: Technology and Process Machines | |
Keywords: scheduling theory, planning, machine-building enterprises, machining, assembly line production, aggregation methods, algorithm, software system |
The paper provides an overview of workflow planning systems used by machine building enterprises. Scheduling problems pertaining to machine building enterprises with assembly line manufacturing are considered. The information aggregation approach is used as a way to solve the scheduling problems. An original scheduling algorithm is described for the enterprise as a whole. The software architecture for the planning system and the results of calculations using this system are presented. The efficiency of the proposed methods is con-firmed through solving test problems of various dimensions.
References
[1] Khobotov E.N. On some models and methods of the solution of scheduling problems in discrete enterprises. Automation and Remote Control, 2007, vol. 68, no. 12, pp. 2172–2186.
[2] Sidorenko A.M., Khobotov E.N. Planirovanie proizvodstv s parallel’noi sborkoi izdelii [Planning of Production Shops with Parallel Assembly of Items]. Vestnik MGTU im. N.E. Baumana. Ser. Mashinostroenie [Herald of the Bauman Moscow State Technical University. Mechanical Engineering]. 2009, no. 3, pp. 100–109.
[3] Kuniaev M.S., Firsov A.S., Khobotov E.N. Vybor podkhoda k postroeniiu sistemy planirovaniia rabot na mashinostroitel’nom predpriiatii [Selection of Approach to Construction of System of Planning Operations at Machine Building Enterprise]. Vestnik MGTU im. N.E. Baumana. Ser. Mashinostroenie [Herald of the Bauman Moscow State Technical University. Mechanical Engineering]. 2009, no. 4, pp. 91–102.
[4] Frolov E.B., Zagidullin R.R. MES-sistemy, kak oni est’, ili evoliutsiia sistem planirovaniia proizvodstva [MES-systems, as they are, or the evolution of production planning systems]. Stanochnyi park [Machinery equipment]. 2008, no.10(55), pp. 31–37.
[5] Ermolova M.A., Khobotov E.N. Sistema planirovaniia i postroeniia raspisanii rabot dlia predpriiatii s konveiernoi sborkoi izdelii [The system of planning and scheduling of construction works for businesses from the conveyor assembly products]. Avtomatizatsiia v promyshlennosti [Automation industry]. 2014, no. 8, pp. 3–8.
[6] Khobotov E.N. Ispol’zovanie optimizatsionno-imitatsionnogo podkhoda dlia resheniia zadach planirovaniia i vybora marshrutov obrabotki. Ch. I [Optimization-simulation approach to scheduling and routing. I]. Avtomatika i telemekhanika [Automation and remote control]. 1996, no. 1, pp. 121–128.
[7] Khobotov E.N. Ispol’zovanie optimizatsionno-imitatsionnogo podkhoda dlia resheniia zadach planirovaniia i vybora marshrutov obrabotki. Ch. II [Optimization-simulation approach to scheduling and routing. II]. Avtomatika i telemekhanika [Automation and remote control]. 1996, no. 2, pp. 147–155.
[8] Sidorenko A.M., Khobotov E.N. Aggregation in job scheduling in machine works. Journal of Computer and Systems Sciences International, 2013, vol. 52, no. 5, pp. 800–810.
[9] Konvei R.V., Maksvell V.A., Miller L.V. Teoriia raspisanii [Scheduling theory]. Moscow, Nauka publ., 1975. 360 p.
[10] Zak Iu.A. Prikladnye zadachi teorii raspisanii i marshrutizatsii perevozok [Applied problems of scheduling and routing traffic]. Moscow, Librokom publ., 2011. 393 p.